Project: GM Recycling

  • Building of layer 1: the ground floor was built and installed in 2017;
  • the inside was provided with a hallway that included a counter window, an office space, a kitchenette, toilets and a shower;
  • building of layer 2: the first floor was built and placed in 2020, together with external stairs;
  • the inside was provided with an inner wall and a large window;
  • the painting (in 2017 and 2020) was coated/sprayed according to RAL-color of choice, in our own studio.