GM Recycling

Project: GM Recycling

  • Floor 1: ground floor was built and installed in 2017;
  • inside equipped with hall with counter window, office space, kitchenette, toilets and shower;
  • floor 2: first floor was built and installed in 2020 along with outdoor stairs;
  • inside fitted with interior wall with large window;
  • painting (in 2017 and 2020) in RAL of your choice, sprayed in our own studio.

Contact us

Share this story